Description
- Manufacturer: Toromont. Train #1 – Built 2004 Train # 2 – Built 2007
- Feed Source: Natural Gas Plant
- Efficiencies: KW hours / Ton CO2 – Nameplate Design – 193 KWH/Tonne – Actual operating target based of historical data 155 KWH/Tonne
- Finished product purity: Pressure 1500KPAG @ -27.4 Degrees Celsius, Moisture Content Maximum 5ppm, Composition Non-Food Grade Liquid. Given the skidded design the plant can be retrofitted to meet increased spec requirements based on inlet feed composition.
- Hours on the plant: Plant # 1 – 49,000hrs, Plant # 2 – 34,000hrs
- Last major turnaround: 2019 all regulatory inspections/maintenance was up to date and rotating equipment (compressors) have all had scheduled overhauls throughout the lifespan of the assets. All high voltage electrical switchgear was regularly PM’d. Consumables such as desiccant/filters has been replaced on the facilities as needed.
- Voltage: 4160v, 480v, 120v, 24vdc
- Design: Process plants are skidded, MCC(s) is skidded, Load Pump(s) are skidded. All steel skid construction.
Features & Benefits
- Dual train design
- Well maintained
- Skid-mounted
- Storage and scales available


